Examples
of completed works |
|
Major Earthworks
in construction of a grade separated junction
on the M40 Motorway at Uxbridge, involving
the construction of four slip roads, an underpass,
and a high level roundabout, together with
the stabilisation of the existing Denham Viaduct.
|
|
Major Earthworks
in the widening of the M25 Motorway between
junctions 15 and 16 (M4 to M40) |
|
Major Earthworks
in the bioremediation and removal of 80,000m3
of contaminated spoil from the collapsed tunnel
on the Heathrow Express Rail Link at Heathrow
Airport |
|
Construction
of a "bottom discharge" rail unloading
facility for the handling of 4,000 tonnes
of aggregates per week at Watford Junction
rail sidings, involving deep excavations adjacent
to a live railway. |
|
Groundworks
for Europe's largest Concrete Batching Plant
nr Heathrow for London Concrete, involving
ground stabilsation, formation of concrete
yard slab, drainage and ducting, and various
associated concrete structures. |