Northfleet
Landfill Facility, Kent |
|
Since 2001
Jayflex have been operating and restoring
the Northfleet landfill facility. |
|
The site has
accepted and safely disposed of some 1.1million
cubic metres of non-hazardous and inert soils.
|
|
The 50-acre
site has been restored in phases following
the installation of a geo-membrane cap and
gas extraction system. |
|
The landfill
site is adjacent to the new Ebbsfleet International
Station and Jayflex were awarded a £2.8milllion
contract by Union Rail to excavate and remove
some 55,000 cubic metres of contaminated soils
from the trace of the new hi-speed railway
link to continental Europe. |
|
The site was
completed in late 2009. |
|
Horton Brook
Quarry, nr. Heathrow |
|
Jayflex has
recently been granted an Environmental Permit
for a new landfill at its 150-acre quarry
at Colnbrook, (near Heathrow). |
|
The permit
allows for the disposal of approx 1.2 million
cubic metres of Inert Soils over a 10 year
period. |
|
Landfilling
at the site is due to commence in 2011. |